Work was recently completed on the construction of a new in-situ concrete base for a 70m high wind turbine at an industrial facility on the outskirts of Cork City for client Enerpower. Works included pouring >500cum of concrete as well as laying approx. 2.5km of cabling. The 1MW turbine, with a blade diameter of 80m, […]
McGinty & O’Shea Ltd. recently commenced work on the above project valued at c.€5.5million. The project primarily consists of the construction of flood defence works in the busy Cork City suburb of Douglas for client Cork City Council and includes the construction of new reinforced and precast concrete flood defence walls, reconstruction of existing bridges, […]
McGinty & O’Shea Ltd. recently completed the installation of an 800mm Ø PRV, one of the largest in the country, at the Chetwynd Resrvoir site in Cork. McGinty & O’Shea Ltd. also undertook the design of the works which when complete facilitates the bypassing and repair of the 15,000,000 gallon reservoir and reduces downstream pressures […]
Work recently commenced on the above project at Kilmore Road Lower on the outskirts of Cork City. The local authority is proposing to build 24 new terraced houses as part of the City North West Quarter Regeneration and due to the anticipated level of rock and topography of the site an enabling works package being […]
Work was completed recently on the above site and included substantial in-situ concrete and cliff face stabilisation works at this scenic East Cork coastal location.
McGinty & O’Shea Ltd. recently commenced work on the N40 Supplementary Works 2018 contract for client, Cork City Council. The works, with a value of c.€1.6m, are located on or near the N40 South Ring Road and consist of various drainage, accomodation and landscaping works as well as modifications to the layout and resurfacing of […]
Irish Water recently appointed McGinty & O’Shea Ltd. to design and build a new pressure reducing system on the existing large diameter pipework at the Chetwynd reservoir site on the outskirts of Cork City. The works are required to facilitate the decommissioning of the 15 million gallons reservoir (constructed in the late 1970s and one […]
McGinty & O’Shea Ltd. recently commenced work on the ‘Skehard Road Realignment and Renewal Project – Phase 1’ contract for client, Cork City Council. Value of the works is approx. €3,000,000. Realignment and improvement works are proposed to the R852 Skehard Road between Park Hill estate junction and Church Road junction (Zone 1 and […]
Liam Callanan, Sinead Collins, Dan Murphy and Peter McCarthy have recently been appointed as Directors of McGinty & O’Shea Ltd. We would like to wish them well in their new roles as we look forward to the continued growth and success of the company into the future.
As part of this initiative, Fintan McGinty (Managing Director) and Liam Callanan (Contracts Manager) will visit each one of our sites throughout the week, taking the opportunity to drive home the importance of maintaining a high standard of safety on all projects, at all times. The collective mission for Construction Safety Week 2017 is to […]